Editing Central Water Reclamation Facility

Jump to navigation Jump to search

Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.

The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision Your text
Line 2: Line 2:
 
The '''Central Water Reclamation Facility''' ('''CWRF''') is an [[ECUA]] sewage treatment facility, constructed to replace the [[Main Street Wastewater Treatment Plant]]. Located in central [[Escambia County]], its construction was expedited following [[storm surge]] damage to the [[Main Street]] plant during [[Hurricane Ivan]] and made possible by a grant from [[FEMA]].  
 
The '''Central Water Reclamation Facility''' ('''CWRF''') is an [[ECUA]] sewage treatment facility, constructed to replace the [[Main Street Wastewater Treatment Plant]]. Located in central [[Escambia County]], its construction was expedited following [[storm surge]] damage to the [[Main Street]] plant during [[Hurricane Ivan]] and made possible by a grant from [[FEMA]].  
  
The Central Water Reclamation Facility (CWRF) began operation in [[2010]]. The $316-million, state-of-the-art facility is the largest public works project in the history of [[Escambia County]]. The plant sits on 2,200 acres of land on Old Chemstrand Road near [[Cantonment]]. It has been designated as an AWT (advanced wastewater treatment) facility, meaning it will produce effluent of a very high quality, which will be disinfected to the level required for unrestricted exposure to the public. One hundred percent of the reclaimed water from the plant will be reused, eliminating any potential surface water discharge. The CWRF is uniquely constructed to withstand Category Five hurricane force winds, and is more than 50 feet above sea level, removing it from any potential flood issues. Several local firms, employing hundreds of Northwest Florida employees, participated in the design and construction of the facility, three major lift stations and 25 miles of pipeline.
+
The Central Water Reclamation Facility (CWRF) began operation in [[2010]]. The $316-million, state-of-the-art facility is the largest public works project in the history of [[Escambia County]]. The plant sits on 2,200 acres of land on Old Chemstrand Road near Cantonment. It has been designated as an AWT (advanced wastewater treatment) facility, meaning it will produce effluent of a very high quality, which will be disinfected to the level required for unrestricted exposure to the public. One hundred percent of the reclaimed water from the plant will be reused, eliminating any potential surface water discharge. The CWRF is uniquely constructed to withstand Category Five hurricane force winds, and is more than 50 feet above sea level, removing it from any potential flood issues. Several local firms, employing hundreds of Northwest Florida employees, participated in the design and construction of the facility, three major lift stations and 25 miles of pipeline.
  
 
{{stub}}
 
{{stub}}

Please note that all contributions to Pensapedia, the Pensacola encyclopedia are considered to be released under the GNU Free Documentation License 1.2 (see Pensapedia:Copyrights for details). If you do not want your writing to be edited mercilessly and redistributed at will, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource. Do not submit copyrighted work without permission!

To edit this page, please answer the question that appears below (more info):

Cancel Editing help (opens in new window)

Template used on this page: