Editing Central Water Reclamation Facility
Jump to navigation
Jump to search
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.
The edit can be undone.
Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 1: | Line 1: | ||
[[Image:CWRF-Construction.jpg|thumb|right|Construction of the CWRF in April 2009]] | [[Image:CWRF-Construction.jpg|thumb|right|Construction of the CWRF in April 2009]] | ||
− | The '''Central Water Reclamation Facility''' ('''CWRF''') is an [[ECUA]] sewage treatment facility | + | The '''Central Water Reclamation Facility''' ('''CWRF''') is an [[ECUA]] sewage treatment facility being constructed to replace the [[Main Street Wastewater Treatment Plant]]. Located in central [[Escambia County]], its construction was expedited following [[storm surge]] damage to the [[Main Street]] plant during [[Hurricane Ivan]] and made possible by a grant from [[FEMA]]. It is expected to go operational in September [[2010]]. |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
[[Category:Emerald Coast Utilities Authority]] | [[Category:Emerald Coast Utilities Authority]] |